Ropemaker street passive fire protection

Ropemaker Street
Design & Build project to deliver 1000m² of welfare facilities

OUR EXPERTISE

At Capstan Group Services, we specialise in a wide range of building remediation services tailored to meet the unique needs of various industries. From fire protection [passive] asbestos remediation, surveys and building refurbishments our team of experts is equipped to handle all aspects of building remediation with precision and care.

Project details

Supply Chain Partner
Value: £680,000.00
Client: Skanska UK PLC
Contract: JCT Design & Build 2016
Duration: 20 weeks


KEY POINTS
Site Welfare

Design & Build Inc. M&E

Passive Fire Protection

FIRAS Accredited Installation

KEY ELEMENTS OF WORK

  • Drylining Decoration

  • Passive Fire Protection

  • Design & Build

  • M&E

  • Ventilation

Scope of Works: Design & Build project to deliver 1000m² of welfare facilities to support over 800nr. Site operatives.

 

The project included the installation of 1-hour fire-rated partitions with compliant steel beam protection; and full M&E services installed for the welfare including

  • Hand Basins

  • Toilets

  • Hot Kitchen; Forced air input and extraction systems giving the necessary air changes,

  • Fire suppressant system including roller shutter to the Hot Kitchen Café

  • WC cubicles

  • First Aid Room

  • Drying Room

  • Subcontractors Office with data points to accommodate 20 Companies

  • Fire alarm system to be integrated into existing systems.
     

New compliant fire doors were required to compartmentalise the welfare and surrounding staircases and subcontractors’ offices, first aid room and assorted storerooms. As the floor had an uneven concrete finish we had to install drop-down seals to counteract the various levels.


This job was assessed as part of our FIRAS accreditation assessment for our qualified carpenters which we passed and certified. We were later awarded the installation of 80nr. assorted fire doors fitted on the main building as part of the ACOP insurance scheme which requires the main contractor (Skanska) to compartmentalise the staircases of the 22-storey building thus providing containment in the event of a fire.

passive fire protection of a welfare area on a construction site
fire door installation of a construction welfare area in London

GET IN TOUCH

Ready to elevate your project? Reach out to Capstan Group Services today to discuss your building remediation needs. Whether it's fire protection, asbestos remediation, surveys or building refurbishment, we are here to ensure high standards for your project.

CONTACT US

For any enquiries, questions, feedback or to request a quote/ site visit please email us at:

 

sales@capstanservices.co.uk

Privacy Notice:

Capstan Group Services will never use your contact details for anything other than the reason they were supplied.

Capstan are committed to reaching carbon net zero by 2050 view our statement here.

Address

Unit 20 Capstan Centre

Thurrock Park Way

Tilbury

Essex

RM18 7HH

Call

01375 842 769

© 2024 Capstan Group Services Ltd

logo of ISO 45001 from citation
logo of ISO 9001 from citation
logo of ISO 14001 from citation
tica_acad_logo.jpg
sme carbon comittment logo
logo of Achilles accreditation
logo of FIRAS accreditation
logo of CHAS accreditation
logo of constructionline accreditation
bottom of page